|
|
|
Side table in production
|
|
|
|
3 legged night stand
|
|
|
|
table pic
|
|
|
|
table detail
|
|
|
|
veneer press
|
|
|
|
wardrobe mirror in production
|
|
|
|
painted headboard
|
|
|
|
|
painted headboard again
|
|
|
|
4 poster headboard in production
|
|
|
|
Gluing up a sleigh bed headboard
|
|
|
|
Spreading glue on veneer of sleigh bed
|
|
|
|
Production inventory
|
|
|
|
Sanding sleigh bed headboard
|
|
|
|
Sleigh bed veneered panel fresh out of press
|
|
|
|
|
The master of chaos
|
|
|
|
Sleigh bed panel
|
|
|
|
Carving for armoire
|
|
|
|
Pine wardrobe mirror in production
|
|
|
|
Coseup of veneering prosess
|
|
|
|
Gluing up for the vacumn press.
|
|
|
|
Laying up a sleigh bed headboard for the press
|
|
|
|
|
Gluing up for the press
|
|
|
|
Sleigh bed headboard glueup
|
|
|
|
Mixing veneer glue
|
|
|
|
Tom cutting veneer on a sleigh bed
|
|
|
|
Bookmatching the crotch veneer
|
|
|
|
Sleigh bed headboard ready for sanding
|
|
|
|
Cutting the veneer for bookmatching
|
|
|
|
|
More matching
|
|
|
|
Captian Fenley at the helm navigating the shop
|
|
|
|
Peering into the magic box
|
|
|